Bathroom Water Proofing

Water proofing is done on the floor of bathroom before applying floor tiles & and on the side of the wall upto 6 inches form floor. It has to be done as we are regular using water and due to some cracks in walls or slabs there are chance of water leakage on lower floor. A chemical is applied. After water proofing treatment is done leave it for 2 days to get proper set on floor.

Rupees per square feet

160/sq ft
Mumbai
150/sq ft
Pune
160/sq ft
Bengaluru
160/sq ft
Delhi
150/sq ft
Goa
150/sq ft
Nagpur
150/sq ft
Nashik
155/sq ft
Ahmedabad
150/sq ft
Surat
150/sq ft
Vadodara

What is included in above Rate ?

  • All rates are with unit of “Per Square foot”
  • It includes waterproofing chemical with labour charges